Your question is Structured Process vs Flexibility. Take a moment with it on the right.
Talk me through your thinking if you like. When you're confident, submit your answer and I'll grade it like a real screen (7/10 or better passes).
What is your strategy for balancing the need for structured processes with the engineering team's desire for flexibility at Teradyne?