Your question is Optimizing BESS Capacity and Configuration. Take a moment with it on the right.
Talk me through your thinking if you like. When you're confident, submit your answer and I'll grade it like a real screen (7/10 or better passes).
How do you determine the optimal capacity and configuration of a BESS system for a specific grid-tied application at Vitis Energy?