Your question is Predictive Maintenance Data Strategy. Take a moment with it on the right.
Talk me through your thinking if you like. When you're confident, submit your answer and I'll grade it like a real screen (7/10 or better passes).
Suppose we want to build a predictive maintenance model for industrial HVAC systems at Schneider Electric North America. What data would you collect, and how would you structure the target variable?