NexChip is bringing up a new server SoC before customer sampling. The validation team supports lab bring-up, test execution, bug triage, and regression tracking across silicon revisions, firmware builds, and test suites. The engineering director wants a dashboard that helps the team quickly assess program health and identify bottlenecks.
In the last 4 weeks, the team executed 18,400 validation runs across 6 labs. Overall pass rate improved from 71% to 78%, but blocker bugs open longer than 14 days increased from 19 to 31. First-pass bring-up success for new boards is 62%, below the 80% target. Average time from failure detection to owner assignment is 11 hours, and re-test turnaround after a fix is 2.8 days. Stakeholders disagree on whether the dashboard should emphasize throughput, defect quality, or milestone readiness.
validation_runs: run_id, board_id, silicon_rev, firmware_build, test_suite, test_case, start_time, end_time, result, lab_idbug_tracker: bug_id, severity, component, created_at, assigned_at, resolved_at, reopened_flag, root_cause, linked_run_idboard_inventory: board_id, board_type, arrival_date, bringup_start_date, first_boot_time, owner_teammilestone_plan: milestone_name, target_date, required_test_coverage, exit_criteria, program_phase