Figma is midway through a 12-week engineering project to rebuild its multiplayer comments service. The project is high priority because comments are used by 62% of weekly active teams, and the current service causes latency spikes during peak collaboration hours. Leadership wants a simple, defensible way to determine whether the project is on track before the next executive review.
The team committed to shipping by June 30 with four major milestones: design sign-off, backend migration, client integration, and production rollout. As of week 6, the project dashboard shows: 52 of 100 planned story points completed, 2 of 4 milestones done, 3 open P1 risks (target: <=1), 18 open bugs in the test environment (target: <=10), build success rate 91% (target: >=95%), and forecasted completion date July 11 based on the current burn rate. Engineering leadership is asking whether the project is truly on track or whether the apparent 52% completion masks schedule risk.
project_plan: milestone_name, planned_date, actual_date, owner, statussprint_board: sprint_id, story_id, story_points, status, created_at, completed_atbug_tracker: bug_id, severity, environment, status, created_at, resolved_atci_cd_runs: run_id, branch, test_pass_rate, build_status, deploy_timerisk_log: risk_id, severity, mitigation_owner, opened_at, closed_at